Dongfang Wind Power assists Huachuang in upgrading its low-efficiency wind turbines, generating a 38.3% increase in power generation compared with the feasibility study data!
Date:2021-10-25 origin:Dongfang Wind Power Visit:10927
Huachuang 2.0MW direct-drive wind turbine generator, main control system, pitch system, hydraulic station and other components have many problems. Among them, the generator problem is the most serious, the safety risk is high, the unit is almost stopped, which causes a huge economy for the wind farm loss.
Dongfang Wind Power has carefully formulated a systematic solution through a series of measures such as on-site inspection and generator return to the factory for dismantling and testing, so as to retain the original components of the wind turbine to the greatest extent and ensure the optimal cost-effectiveness of the solution.
1) Survey and map the original wind turbine components and establish a three-dimensional model;
2) Recalculate the load of the wind turbine;
3) Check the strength of key components such as wheel hub, frame, tower tube, bearing, etc.;
4) Use Dongfang mature direct-drive generator to replace the original fan malfunction generator;
5) Use Oriental mature direct drive algorithm logic, combined with the original master control system configuration, to customize the development of the master control program;
6) Customized design and partial replacement of the original pitch system;
7) Software upgrade and parameter adjustment of the original inverter;
8) Transform the original generator cooling system, engine room cover, slip ring bracket, hydraulic station, etc.
Dongfang Wind Power has overcome the adverse effects of the industry's rush for installation, rain and snow weather, and through scientific organization of construction, rational deployment of resources, and strengthening of technical reform supervision, it completed the transformation, hoisting and commissioning of the prototype within two weeks, ensuring the unit's grid connection on schedule. After the renovation, the wind turbine rejuvenated its vitality, and withstood the test of strong wind, rain and snow, and continued stable operation, which strongly proved the reliability and effectiveness of the renovation plan.
In the entire transformation process of the wind turbine, Beijing Jianheng Certification Center participated in the whole process as a third-party organization, and provided objective and professional judgments on the collection of unit problems, the disassembly of the generator, and the evaluation of the transformation plan. The assessment considered that the technical plan was feasible and capable Solve the problems existing in the fan.
Dongfang Wind Power will continue to exert its professional capabilities in the transformation and upgrading of wind turbines. Through the overall solution of high safety, high reliability, and optimal cost performance, through fast and efficient construction, more Huachuang wind turbines will be given new vigor and vitality. , To help more new energy companies optimize asset efficiency and achieve higher power generation revenue.
Related articles
-
线槽的作用及叫法
线槽的作用及叫法
-
2009第四届中国(上海)国际母线线槽及桥架工业展览会
金属线槽、镀锡母线槽、铝合金母线槽、钢外壳母线槽、组合式线槽、防碾压踩踏线槽 、机械设备配电线槽、电话线槽、PVC线槽、地板线槽、插接母线线槽、微动力及照明母线槽、高中低压电流空气式绝缘插接母线槽、带散热片密集型绝缘插接式线槽、全封闭树脂浇注母线槽(防水、防火、防腐母线槽)、共箱高低压母线槽及轨道交通专用线槽等周边相关加工配套产品。
-
线槽规格和品种以及线缆的敷设
线槽规格和品种以及线缆的敷设
-
低烟无卤阻燃型走线槽
低烟无卤阻燃型走线槽
-
PVC线槽的安装-综合布线
线槽安装时,应注意与强电线槽的隔离。布线系统应避免与强电线路在无屏蔽、距离小于20cm情况下平行走3米以上。如果无法避免,该段线槽需采取屏蔽隔离措施。进入家具的电缆管线由最近的吊顶线槽沿隔墙下到地面,并从地面镗槽埋管到家具隔断下。
-
线槽用PVC是什么材料
在塑料制品中,线槽的主要原料是PVC.
-
线槽规格
线槽规格,上海日成-RCCN,专业制造线槽,技术团队及丰富经验,提供PVC线槽、行线槽、配线槽在工业设计、机械设计等配电柜综合布线解决方案.专业服务于外资及国内品牌有线槽需求的企业,产品通过UL,CE,ROHS国际认证.
-
线槽种类
线槽在办公室的安装细节需要要注意的是线槽种类,包括的深度和宽度,因为尺寸不足也会让地面在放线管后不平,到时候只有返工。