Shanghai Richeng Electronics Co. Ltd - ISO9001/IATF16949/ISO/TS22163
Choose Language

Wiring duct,Cable Gland,Cable Tie,Terminals,RCCN

Huaneng Group won the right to develop 1514MW onshore wind power project in Liaoning Province

On October 9, the Development and Reform Commission of Yingkou City, Liaoning Province announced the results of the optimal allocation of onshore wind power competition. A total of 6 projects were selected, with a cumulative installed capacity of 1514MW (14MW exceeding the bid announcement), and the parent company of the project developer is Huaneng Group.

According to the previous tender announcement, the preferred wind power scale is 1.5 million kilowatts, all used to support the construction of non-subsidized wind power projects, and applicants are required to commit to the official start of the selected projects by June 2022 and completion by the end of December 2024 Grid-connected.

Up to now, a total of provinces and cities including Shanxi, Shandong, Guangxi, Tianjin, Hebei, Gansu (Dingxi, Lanzhou, Jiuquan, Zhangye), Shaanxi, Inner Mongolia (Chifeng) and other provinces and cities have issued a list of guaranteed wind power and photovoltaic projects in 2021, which are included in the list. The cumulative scale of wind power projects reached 16.9GW.

Announcement of the results of the competitive allocation of onshore wind power construction indicators in Yingkou City.



In accordance with the "Notice on Issues Concerning the Development and Construction of Wind Power and Photovoltaic Power Generation in 2021" (Guoneng Fa Xinneng [2021] No. 25) and the "Construction Plan for New Wind Power Projects in Liaoning Province" issued by the National Development and Reform Commission and the National Energy Administration (Liaoning Gai Energy [2021] No. 378) and other documents and the requirements of the executive meeting of the Yingkou Municipal Government. Yingkou Development and Reform Commission entrusted China Water Resources and Hydropower Construction Engineering Consulting Co., Ltd. to organize experts to objectively score the declared projects and investors. The preferred results are now publicized (publication) The period is from October 9th to October 11th, 2021).

Yingkou Development and Reform Commission

October 9, 2021

Related articles

Previous: Chinese electric car manufacturers Dongfeng Xiaokang and BYD flood into the Japanese truck and bus market
Next: In September, the penetration rate of new energy passenger vehicles in my country has exceeded 20%. Automobile "chip shortage" or disguised assistance to electrification
On-line
contact
message
download
Print
WeChat WeChat
Collection
TOP